Services · Bid writing
Bids written
to get approved.
Your crew finds the damage. We turn the photos into a bid the national can approve: measured, specific and written in the shape that national's reviewers pass. Bids are where the real money in a work order is, so this is the part we spend the most care on.
$6 per work order. No contract, no minimum.
Why good damage gets a bad answer.
Most bids are not rejected because the damage isn't real. They are cut because the bid doesn't prove it. "Roof leak, repair" with a price gives a reviewer nothing to approve and every reason to trim.
Reviewers compare the bid to the photos line by line. If the quantity can't be checked in a photo, it gets reduced. If the scope is vague, it gets narrowed. If the bid doesn't say what happens if the work isn't done, it waits.
We read every bid document on our own book, around seventeen and a half thousand PDFs, and matched each bid to what came back. The approved ones looked the same, whatever the national.
How we write a bid.
1Find everything the photos show
We go through the full photo set, not just the shots the crew flagged. Damage in the background of a completion photo is still a bid.
2Measure from the photos
Square feet, linear feet, cubic yards, counts. The measurement goes into the bid, and the photo that proves it is named next to it.
3State the standard being breached
Why this needs doing now: an active leak, a code or HUD standard, a safety hazard, further damage if it waits. That sentence is what moves a bid from "later" to "approved".
4Define the scope so it can't be trimmed
Exactly what will be done, with what, to what extent, and the before, during and after photos the crew will take.
5Price it against the right line items
Each line is priced against our catalog of 313 line-item codes across 26 trade categories, or your national's own pricing where it applies, and written in that national's format.
What one of our bid lines reads like
Roof: active leak at rear slope above bedroom 2. 3 missing shingles and exposed felt measured at approx. 12 SF (photos 14–16), with water staining on the bedroom ceiling below measured at 4 x 3 ft (photo 22). Leak is ongoing and will cause further interior damage. Recommend removing and replacing damaged shingles and felt, approx. 12 SF, matching existing material, and sealing the area. Before, during and after photos will be provided.
Measurement, photo reference, why it can't wait, defined scope, documentation promise. Every bid line we write has those five parts.
What's included
- ✓Damage identification from the full photo set
- ✓Measured quantities with photo references
- ✓Written to each national's bid format
- ✓Priced against a 313-code catalog or the national's pricing
- ✓Previous damage re-bid in full when it's still there
- ✓Part of the same $6 work order, no separate bid fee
Common questions
How much does bid writing cost?
Bids are included in the $6 per work order. There is no separate charge for writing bids, however many lines the order needs.
Do you bid for Safeguard, MCS, Cyprexx and the other nationals?
Yes. Each national has its own bid format and its own reviewers, and we write to each one. Our portal pages explain what each national looks for.
Can you re-bid damage from a previous order?
Yes. If the damage is still there in the new photos, we bid it again in full rather than writing "see previous bid", which is a common reason bids go nowhere.
Send us one order and judge the result.
Also see: property preservation invoice processing · what each national looks for · what gets a bid approved